Jan 2021 – Jan 2022

DRILLING RIG PREPARATION WELL PADS 250X200M AND ROAD

Contractual: Oil and gas company
Beneficiary/Employer: Zfod / Eni – Iraq
Period: Jan 2021 – Jan 2022
Value: USD 760,000.00

 

Scope of work

  • Remove loss topsoil 100 mm thickness with
    compact 95%
  • Berm backfilling 2 M of height.
  • Excavation and plastic liner installation of
    (Water pit and cuttings pits) with 3 meters of
    depth
  • Supply all the material and equipment`s to cast of caller (3 x3 x3) with conductor pipe 32» 60-meter depth
  • Modify, Prepare and compact roads.
  • Supply and install riser wire 1 height above the berm with all accessories
  • Supply and install security gate 12m width by 2.5 meter of height.
  • Supply all the material and equipment`s to cast of rig equipment`s pad

Gallery

Latest Projects

MAJNOON OIL FIELD

MAJNOON JETTY PROJECT

April 2011 – January 2012
Zubair IPF, Iraq

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

December 2012 – January 2016
Zubair IPF, Iraq

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

January 2013 – December 2016